Secured Trading Service

3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine

Suzhou Planet Machinery Co., Ltd.
  • Audited Supplier
  • 6 yrs

Contact Supplier

Still deciding? Get samples of $ !
Request Sample

Product Highlights

  • Fully Automatic Operation: PLC controlled system with automatic rinsing, filling, and capping processes.
  • High Precision Filling: 1% filling precision with non-contact frequency conversion filling technology.
  • Food Grade Materials: Constructed with SUS304 and 316L stainless steel for all contact parts.
  • Low Defect Rate: Stable capping system ensures defective rate is less than or equal to 0.2%.
  • Customizable Voltage: Voltage can be customized to meet specific local electrical requirements.
  • Wide Capacity Range: Production capacity adjustable from 100 to 2000 barrels per hour.
  • Overseas Service Support: Engineers available to provide on-site service and maintenance overseas.
  • Certified Quality: Machine holds CE, ISO, and SGS certifications for safety and quality.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of 3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine

3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine pictures & photos
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine pictures & photos
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine pictures & photos
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine pictures & photos
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine pictures & photos
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine pictures & photos
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
  • 3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
  • 3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
    3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
  • 3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
    3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
  • 3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
    3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
  • 3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
    3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
  • 3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
    3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
  • 3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
    3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine

Find Similar Products

Product Description


3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
Suitable products
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
Product Description
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
Rinsing part
-Uploading and dropping barrels changed from 45 degree to translatory which is more stable. 2. Washing nozzles can insert into
10-15 cm of the barrel in order to rinse impurities down. Rinsing pump is separately controlled by PLC.
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
Filling Part
-The washing bottle, filling, sealing are connecting with the thumbwheel card bottleneck transportation methods.
-Non contact shifting frequency conversion filling
-The rotating disk is all made of SUS304 stainless.
-Filling valve manufactured by SUS304.
-The filling valve structure design is reasonable, the filling quantity is accurate.
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
Bottle Capping.
- Place and capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during
capping
- All 304/316 stainless steel construction
- Automatic stop when lack of bottle
- Capping effect is stable and reliable, Defective rate ≤0.2%
Machine Parameter
Project Name:
Full Automatic Complete can 150-3000bph Production Line
Pure water, mineral water etc.
Material
Shape
Filling volume
Filling level(mm)
Neck type
PET or PC
round or spare bottle
7.5-18.9L
Distance from bottle neck
According request
As request
Adjustable specifications
of the bottle type
Middle Mould Based on bottle  diameter ≤350mm can Height≤550mm
Customers need to buy additional change-over parts for the different bottles.
If using square bottles, then bottle separating system will be added.
Container Label & Control Mode
Packaging system
Palletizing system

Hot Melt Roll-Fed
PVC Shrink Label
Full Label/ Half Label
Manual / Automaticc
Packing system
Min, Spec.
Manual
Film shrinker
Wrap Around packer
Robert Packing Machine
1*1
User Ambient Conditions
Temperature:10~40ºC;Humidity:No dew
User Electrical Supply Specification
Voltage:380V±5%, 3phase; Frequency:50HZ±1%
Auxiliary Machinery
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
Company Profile
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
3 & 5 Gallon Barreled Water Filling Production Line / 20L Water Bottling Machine
FAQ
Q: What is included in your warranty coverage? A: Our standard warranty covers 12–24 months (varies by product) from the date of delivery. It includes: Free repair or replacement of defective parts due to manufacturing issues. Labor costs for troubleshooting and repairs by our certified technicians. Exclusions: Damage caused by misuse, unauthorized modifications, or improper maintenance.
 
Q: How do I request technical support? A: Contact us via: 24/7 by call (emergency support). , (include your machine model, serial number, and issue details). 
 
Q: Do you provide on-site servicing? A: Yes! For complex issues requiring hands-on intervention, we dispatch technicians within. Domestic: 48–72 hours (China). International: 5–7 business days (subject to local logistics). Note: Travel and accommodation fees may apply for international requests beyond the warranty period.
 
Q: How can I purchase spare parts? A: We maintain a global inventory of genuine spare parts.Contact your regional service center for expedited shipping.

Q: What if my machine breaks down after the warranty expires? A: We offer lifetime paid support: Competitive pricing for repairs and replacements. Priority access to technical guidance. Discounted annual maintenance contracts (AMCs) for cost predictability.
 
Q: Do you provide operator training? A: Absolutely. We offer: Free basic training during installation (covers operation, cleaning, and safety). Advanced workshops (paid) on troubleshooting, maintenance, and software updates. Remote training sessions via video call upon request.
 
Q: How often should I schedule maintenance? A: To ensure peak performance: Preventive Maintenance: Every 6–12 months (depending on usage intensity). Daily/Weekly Checks: Refer to the maintenance checklist in your user manual. Pro Tip: Sign up for our Maintenance Reminder Service to receive automated alerts.
 
Q: Can I upgrade my older machine with new features? A: Yes! Many models support retrofitting, such as: IoT connectivity for real-time monitoring. Energy-efficient motor upgrades. Software updates for enhanced automation. Contact our engineering team for a compatibility assessment.
 
Q: What if I need documentation (manuals, certificates)? A: All documents are available digitally: Hard copies can be shipped upon request (shipping fees apply).
 
Q: How do you handle complaints or feedback? A: We take every concern seriously. Escalate issues via: Customer Care Team: (response within 24 hours). Quality Assurance Department: (for unresolved technical/service disputes). We aim to resolve all cases within 5 business days.

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2541599". Items marked "verified" are certified.

Watch Video
Watch Video
Suzhou Planet Machinery Co., Ltd.
Suzhou Planet Machinery Co., Ltd.
Suzhou Planet Machinery Co., Ltd.
Suzhou Planet Machinery Co., Ltd.
Suzhou Planet Machinery Co., Ltd.
Suzhou Planet Machinery Co., Ltd.
Suzhou Planet Machinery Co., Ltd.
Suzhou Planet Machinery Co., Ltd.

About Our Factory & Business Background

Address
Leyu Town, Zhangjiagang City, Suzhou, Jiangsu, China
Terms of Payment
LC, T/T, PayPal, Western Union
International Commercial Terms(Incoterms)
FOB, EXW, CFR, CIF, Others
Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Nearest Port
SHANGHAI PORT, NINGBO PORT

Our Production Capability & Technical Expertise

Main Products
Water Filling Machine, Juice Filing Machine, Carbonated Drinks Filling Machine, Can Filling Machine, Oil Filling Machine, Barreled Water Filling Machine, Bottle Blowing Machine, Lubricant Oil Filling Machine, Detergents Filling Machine, Water Treatment System

Our Industry Experience & Global Business Record

Export Year
2021-09-16

FAQ

What is the warranty period for this machine?
The machine comes with a 12-month warranty.
What is the filling precision of the machine?
The filling precision is 1% for liquid level control.
Can the voltage be customized?
Yes, the voltage is customized according to customer requirements.
What materials are used in the construction?
The machine is made of SUS304 and 316L stainless steel.
What is the production capacity range?
The capacity ranges from 100 to 2000 barrels per hour.
Is overseas service available?
Yes, engineers are available to service machinery overseas.
What certifications does the machine have?
The machine has CE, ISO, and SGS certifications.
What is the lead time for production?
Peak season lead time is one month, while off-season lead time is 1-3 months.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed